Balaji Action Buildwell rooftop solar plant at Sitarganj, Uttarakhand, by Arrays Ingenieria
Case Study · Industrial · Rooftop I&C

Balaji Action Buildwell, Sitarganj: Solar I&C, BOS and Civil Works

Installation & commissioning, balance-of-system works, civil works and approvals on Balaji Action Buildwell's solar project at Sitarganj, Uttarakhand, for Tata Power Solar.

The Project

About the Balaji Action, Uttarakhand project

The orders describe the project in more than one way, and we show each scope as it was ordered rather than adding the figures together: rooftop BOS services for a project of 4000.32 kWp, installation & commissioning of a sheet-roof plant described as 3 MWp, and civil works with pile foundations for a ground-mount plant also described as 3 MWp.

Tata Power Solar's 2022 orders also covered a labour colony for the site crew and the CEIG approvals for the project.

Further orders in 2023 covered additional I&C work, an ITB canopy, additional cable trays, fire extinguishers and sand buckets, and cable lugs: the details that take a large plant from installed to inspected and handed over.

Our scope of work

  • Installation & commissioning of the 3 MWp sheet-roof plant
  • Rooftop BOS services for the 4000.32 kWp project
  • Civil work and pile foundations for the ground-mount portion
  • CEIG approvals
  • ITB canopy, cable trays and fire safety equipment
  • Labour colony for the site crew

Photos

Balaji Action Buildwell rooftop solar plant at Sitarganj, Uttarakhand, by Arrays Ingenieria
Project Timeline

How the Project Unfolded

The work, stage by stage, as it was ordered and delivered.

  1. Rooftop services for 4000.32 kWp

    BOS services for the full project.

  2. Labour colony

    Construction of a labour colony for the site crew.

  3. I&C and approvals

    Installation & commissioning of the 3 MWp sheet-roof plant; CEIG approvals for the project.

  4. Safety and ground-mount civil works

    Portable fire extinguishers and sand buckets; civil works and pile foundations for the ground-mount plant (ordered as 3 MWp).

  5. BOS completion

    Further rooftop services, cable lugs and additional cable trays.

  6. Final works

    ITB canopy and additional I&C works.

On Site

Challenges and How We Handled Them

Roof and ground on one site

A large sheet-roof plant and ground-mount civil works meant two very different jobs, height work and piling, on one industrial campus.

A camp for the crew

With a large crew on site for months, a proper labour colony was part of the scope: decent living conditions are part of working safely.

Approvals as part of the job

CEIG approvals for the project were in our scope, so inspection was planned into the schedule rather than added at the end.

Installation & Commissioning

What Our I&C Scope Covered

The standard rooftop installation & commissioning scope we deliver to EPC majors' specifications, after the mandatory quality and safety training and contractor safety sign-off.

Civil works

  • Earth-pit chambers and covers (RCC/PCC)
  • Foundations for inverters, ACDB, ITB and accessories
  • Cable trenches at ground level

Mechanical

  • Lifting and handling of all material to the roof
  • Module mounting structure installation on the sheet roof
  • Module installation and interconnection
  • Canopies for wall-mounted inverters and junction boxes

DC side

  • String wiring from modules to inverters, tagged and identified
  • DC cables in conduit or tray
  • MC4 connectors crimped male and female
  • Array junction boxes

AC side and protection

  • Inverters and inverter terminal boxes
  • AC distribution board (ACDB)
  • LT AC cables in trays to the approved layout
  • Reverse power relays installed and commissioned

Earthing and lightning

  • Earth electrodes and pits
  • Earthing strips for structures, inverters and ACDB, including welding
  • Lightning arrestors

Roof safety and access

  • Skylight safety mesh
  • Walkways and hand rails
  • Safety lifelines for workers
  • Scaffolding for installation

Monitoring, cleaning and handover

  • Data monitoring system (SCADA / power manager)
  • Module cleaning system with pump and motor
  • Safety posters, storage under covers and care until handover
  • Testing, commissioning and handover
Talk to an engineer

Planning a solar plant? Let's build it together.

CAPEX solar EPC, installation & commissioning and civil works, delivered by an ex-servicemen-led team across India. Tell us about your site and an engineer will get back to you.