Super Smelters 1980.3 kWp rooftop solar plant in West Bengal, built by Arrays Ingenieria with Tata Power Solar
Case Study · Industrial · Rooftop

Super Smelters: 1980.3 kWp Rooftop Solar Plant

A 1980.3 kWp rooftop solar power plant, about 2 MW, on the open roofs of Super Smelters Ltd., described by the local press as the largest industrial unit in the Jamuria industrial area of West Bengal.

The Project

About the Super Smelters, West Bengal project

The plant was built in collaboration with Tata Power Solar, with Arrays Ingenieria as implementation partner. It was inaugurated by Super Smelters' director, Sanjay Singhania, with Lt. Gen. Ashish Ranjan Prasad (Retd) of Arrays Ingenieria present.

Super Smelters issued Arrays Ingenieria a letter of appreciation for the project, and the inauguration was covered by Sanmarg and other Hindi dailies.

In 2024 Tata Power Solar engaged Arrays Ingenieria for the installation & commissioning of the 1980 kW sheet-roof plant, the BOS materials and additional cabling, cable trays and earth excavation, the earthing strip, and the supply and service of the module cleaning system.

Our scope of work

  • Installation & commissioning of the 1980 kW sheet-roof plant
  • Balance-of-system (BOS) materials and additional cabling
  • Cable trays and earth excavation
  • Earthing strip and self-drilling fasteners
  • Module cleaning system: supply and services
  • Testing and commissioning

In the news

Photos

Super Smelters 1980.3 kWp rooftop solar plant in West Bengal, built by Arrays Ingenieria with Tata Power Solar
Inauguration of the 1980.3 kWp Super Smelters solar plant, Arrays Ingenieria
Large industrial rooftop solar array installed by Arrays Ingenieria
Project Timeline

How the Project Unfolded

The work, stage by stage, as it was ordered and delivered.

  1. Installation & commissioning

    I&C of the 1980 kW sheet-roof plant, its BOS materials and additional cable, and the module cleaning system.

  2. Fixings

    Self-drilling screws for the sheet-roof structures.

  3. Cable trays and excavation

    Additional cable-tray services and earth excavation.

  4. Earthing strip

    Earthing strip for the plant.

  5. Plant inaugurated

    Inaugurated by Super Smelters' director, with Lt. Gen. Ashish Ranjan Prasad (Retd) present; Super Smelters issued a letter of appreciation.

Installation & Commissioning

What Our I&C Scope Covered

The standard rooftop installation & commissioning scope we deliver to EPC majors' specifications, after the mandatory quality and safety training and contractor safety sign-off.

Civil works

  • Earth-pit chambers and covers (RCC/PCC)
  • Foundations for inverters, ACDB, ITB and accessories
  • Cable trenches at ground level

Mechanical

  • Lifting and handling of all material to the roof
  • Module mounting structure installation on the sheet roof
  • Module installation and interconnection
  • Canopies for wall-mounted inverters and junction boxes

DC side

  • String wiring from modules to inverters, tagged and identified
  • DC cables in conduit or tray
  • MC4 connectors crimped male and female
  • Array junction boxes

AC side and protection

  • Inverters and inverter terminal boxes
  • AC distribution board (ACDB)
  • LT AC cables in trays to the approved layout
  • Reverse power relays installed and commissioned

Earthing and lightning

  • Earth electrodes and pits
  • Earthing strips for structures, inverters and ACDB, including welding
  • Lightning arrestors

Roof safety and access

  • Skylight safety mesh
  • Walkways and hand rails
  • Safety lifelines for workers
  • Scaffolding for installation

Monitoring, cleaning and handover

  • Data monitoring system (SCADA / power manager)
  • Module cleaning system with pump and motor
  • Safety posters, storage under covers and care until handover
  • Testing, commissioning and handover
Documents

Orders, Certificates & Press

The documents behind this case study. Tap to view full size.

Super Smelters Ltd. letter of appreciation, 1980.3 kWp solar plant, Arrays Ingenieria
Super Smelters Ltd. letter of appreciation, 1980.3 kWp solar plant
Talk to an engineer

Planning a solar plant? Let's build it together.

CAPEX solar EPC, installation & commissioning and civil works, delivered by an ex-servicemen-led team across India. Tell us about your site and an engineer will get back to you.